fbpx
Width: 0.7m
Length: 10m (4 x 2.5m Bays)
Height: 4.0m
$9800
(Inclusive GST)
Hire for $440 /week
See Package Inclusions

Select Add-ons

Aluminium Platform Upgrade

Upgrade to the Aluminium Platforms


Addon Subtotal: $0
Clear

Shift Finance - Pay Your Way

Looking to Finance your Purchase? Learn More about your Finance Options >>

SKU: KA-L10W0.6H4.0-2D-TL

Pickup Options

Delivery Charges:

Price Match
Enquire Now

Medium-Duty 450kg S.W.L. 0.7m (W) x 10.0m (L) x 4.0m (H). We are Australia’s leading manufacturer and distributor of scaffolding and access equipment.

Synergy’s Aluminium Quickstage system is the most durable, lightweight scaffolding system on the market. Ideal for Builders, Painters, Renderers & Tradesmen that need to access any height with ease and complete safety.

For bulk orders and pricing please contact us

UPGRADE TO ALUMINIUM PLATFORMS FOR ONLY $400
Our aluminium platforms are relatively light in weight but still holds high level of strength, reliability & durability. They are quite easy to manoeuvre around a jobsite or for personal use. Our aluminium platforms will provide you with the most solid & stable working environment.

Medium-Duty 450kg S.W.L. 1.3m (W) x 10.0m (L) x 4.0m (H). We are Australia’s leading manufacturer and distributor of scaffolding and access equipment.

INCLUSIONS

table {
border-collapse: collapse;
width: 100%;
}
td, th {
border: 1px solid #dddddd;
text-align: left;
}

Quantity Description Individual Weight(kg) Total Weight(kg)
10 Steel Base Jacks 7.00 70.00
10 3.00m Standards 4.00 40.00
10 2.00m Standards 3.29 32.90
10 0.50m Standards 1.05 10.50
48 2.50m Ledgers 3.78 181.44
23 0.74m Ledgers 1.90 43.70
8 2.50m Platforms 18.35 146.80
4 3.20m Diagonal Braces 5.30 21.20
6 1.60m Diagonal Braces 3.44 20.64
4 900Tube 3.78 15.12
4 Wall Brackets 2.80 11.20
4 Double Coupler 1.10 4.40
2 3.00m Ladders 9.70 19.40
8 2.50m Toeboards 4.80 38.40
4 0.74m Toeboards 0.98 3.92
10 Toeboard Clips

ALUMINIUM TOTAL WEIGHT: 659.70kg

STEEL TOTAL WEIGHT: 1312.79kg

TOTAL WEIGHT DIFFERENCE: 653.17kg

Standards
Standards are the vertical uprights. Made from durable, structural aluminium, the standards stack vertically and are locked together with the Synergy ledger scaffold wedge at the end of ledgers and transoms. The standards have nodes or stars at 0.5m increments. Ledgers and transoms are fixed to the standard via these nodes

Ledgers
Ledgers are made from durable, structural aluminium with a cast wedge-fixing device to fit into the star of the standard at each end. When two ledgers are installed adjacent to one another along with two Transoms, this allows the platforms to be installed, creating a work platform. They are also used as handrails in the scaffold system.

Diagonal Braces
The diagonal brace is used to the full height of the scaffold in a longitudinal direction.
They are designed to provide stability to the scaffolding system.

Hop-ups
Hop-ups provide an additional cantilevered working platform. Can be used on any side of the scaffold to get nearer or better access to the working area.

KA-2.5X0.6PH 2500*600mm Platform with Hatch
Our platform is 2500mm from centre to centre with the deck made from marine ply and aluminium frame. It features two easy-lift hatches. The first and larger allows for access between levels while ensuring the worker is safe while the second is a ladder hatch.

Timber kickboards
Synergy’s Toeboards are made of plywood material and are designed for an easy and secure fit.

Aluminium scaffold ladder
Our Aluminium Ladders features a brace to secure the ladder at any angle and hooks to rest on the scaffold ladder frame rungs.

This Painters Scaffold Kit is:

0.7m Wide
10.0m Long (4 x 2.5m Bays)
4.0m Top Platform Height
Work Cover Plank Registration Number: PFS-6-165757/13

Medium Duty
Tube Material: Aluminium 6061-T6
Tig Welding
Tube Diameter: 48.4mm
Tube Wall Thickness: 2.6mm
S.W.L: 450kg

1 Year Manufacturer Warranty

10 Years Welding Warranty

Safe Work Load (SWL):  225kgs

Please use the table below to see if pickup or delivery is available at your location for both sales and hire:

We Deliver Australia Wide! (Sales only)

CITY HIRE SALES
SYDNEY (Revesby) Pickup/Delivery Pickup/Delivery
SYDNEY (Chipping Norton) Pickup/Delivery Pickup/Delivery
BRISBANE Pickup/Delivery Pickup/Delivery
MELBOURNE  Pickup/Delivery Pickup/Delivery
ADELAIDE N/A Delivery
PERTH N/A Delivery

SHIPPING

All our scaffolds are made up of individual components that are neatly packed and delivered on standard sized pallets.

The vast majority of orders are same day or next day delivery if delivered to metro areas in the following cities:

  • Sydney
  • Melbourne
  • Brisbane
  • Perth
  • Adelaide

Delivery to other cities in Australia or to rural or regional areas can take up to one week depending on the courier company.

We aim to provide the best price on freight hence why we use a vast majority or courier companies depending on factors such as price, speed and insurance policies.

Your order will be sent out with one of the following courier companies:

  • Samson Express
  • Mainfreight
  • Century couriers
  • Toll IPEC / Toll Express
  • Capital Transport
  • Northline
  • TNT
  • Synergy Scaffolding (Internal deliveries)

Due to high order demands and no control over external courier’s companies, we cannot always guarantee delivery within those timeframes.

PICKUP

If you decide to pick up your scaffold from one of our warehouses, we can either hand load the parts onto your vehicle (this is suitable for those who want to pick up in a van, ute or vehicle with roof racks) or we can forklift on the scaffold packed on a pallet.

  • Website prices are subject to change at any time without notice, Synergy Aluminium Towers Pty Ltd cannot guarantee the prices listed on our website as prices can change prior to being updated online.
  • Please check for availability in-store prior to arriving due to different locations holding different stock
  • Please refer to the inclusions listed in the detail section for each scaffold as image components may differ

Workcover Certificate

Warranty Certificate